Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Costal Inlets Research Program
>
> Fig. 6. Hypothetical relocated Fire Island Inlet: calculated (A) peak ebb current, and (B) peak flood current at the entrance
Fig. 5. Existing Fire Island Inlet: calculated (A) peak ebb current, and (B) peak flood current at the entrance
Existing Condition and Other "Local" Project Alternatives
kraus-zarillo-travolaro-cs03
Page Navigation
6
7
8
9
10
11
12
13
14
15
A
New
Inlet
Peak
Ebb
B
New
Inlet
Peak
Flood
Fig.
6.
Hypothetical
relocated
Fire
Island
Inlet:
calculated
(A)
peak
ebb
current,
and
(B)
peak
flood
current
at
the
entrance
10