about 300,000 m3/year. That volume has increased in recent years to an annualized average rate
exceeding 400,000 m3/year, approximately equaling the total annual dredging at the other five
federally maintained inlets. The present annualized cost of dredging at Fire Island Inlet, with the
sand bypassed to the down-drift side, is about million.
Great South Bay
Fire Islands
Captree
Island
Sexton
Sexton Island
Oak Is.
Cedar Is.
Dik
se
e
Oak Beach
thou
h
Ligh
eac
dar B
Gilgo
Ce
t
d Inle
lan
Is.
Fire Is
Fire Island
ch
Bea
Jetty
ilgo
2 km
G
Atlantic Ocean
Fig. 2. Location map for Fire Island Inlet
Fig. 3. U.S. Army Corps of Engineers, Ne