> Figure 4. Construction of the rubble mound jetty off Democrat Point began on May 23, 1939.
Figure 3. Location map for Fire Island Inlet
Figure 5. Sand dike was created in 1959, to divert currents that caused heavy erosion focused on north side of inlet (Panuzio 1968).
Bonisteel-etal-SB-04
Page Navigation
11
12
13
14
15
16
17
18
19
20
21
To
appear:
Shore
&
Beach
,
Vol
72,
No.
1,
2004.
Figure 4.
Construction
of
the
rubble
mound
jetty
off
Democrat
Point
began on
May
23,
1939
and
was
completed
on
April
15,
1941
(Gofseyeff
1952).