To appear: Shore & Beach, Vol 72, No. 1, 2004.
Table 1. Fire Island Inlet engineering activities (USACE-NAN (1998), USACE-NAN (1985),
CENAN Records (1998-2002). Adapted from: USACE (2002)
Date
Activity
Description
Location
Ocean
Fire Island
1927
40 million cubic yards of embankment fill
Parkway
Inlet to Jones
Inlet
1941
Jetty
5,000-ft stone jetty to halt Inlet migration
Eastern Bank
Dredging & Channel dredged to 15 ft deep and 200 ft wide; 400,000
Inlet and Oak
1946
Beach fill cubic yards from channel placed on 4,000-ft segment of Oak Beach
Beach
1946 - 55 Beach fill
Nourishment averaged 150,000 cy/year
Oak Beach
Authorized channel dimensions modified to 10 ft deep & 250 Inlet
1950
Design
ft wide
1953
Storm
Storm results in new channel dimensions as modified in 1950 Inlet
1954
Dredging
Maintenance dredging 118,000 cubic yards
Inlet Channel
1955
Dredging
Advanced dredging to preclude northward channel shift
Inlet
1,000,000 cubic yards along eastern segment of Fire Island
Gilgo & Tobay
1955-59
Beach fill
to Jones Inlet reach
Beaches
1956-59
Dredging
Maintenance dredging 290,000 cubic yards
Inlet Channel
Dredging & 3,100,000 cubic yards dredged from the ebb shoal:
1959
Ebb Shoal
Beach fill 2,000,000 cubic yards placed on feeder beach west of Inlet
1,100,000 cubic yards to construct one-half mile closure dike
across channel along Oak Beach; referred to as the Thumb;
later fortified with riprap
1960-61
Dredging
Maintenance dredging 292,000 cubic yards
Inlet Channel
Dredging & 2,200,000 cubic yards dredged from Bay to protect Ocean
Gilgo & Tobay
1961
Beach fill Parkway
Beaches
1963-67
Dredging
Maintenance dredging 747,000 cubic yards
Inlet Channel
Dredging & 1,925,000 cubic yards dredged from ebb shoal, placed on
1964
Ebb Shoal
Beach fill feeder beach
1967
Dredging
Material excavated to bolster revetted sand dike
Inlet & Thumb
Maintenance dredging 194,000 cubic yards placed at Cedar Inlet Channel
1968
Dredging
Beach
Dredging & Dredged from north of Gilgo Beach and placed on beach
1968-69
Gilgo
Beach fill east of Gilgo Pavilion
1969-71
Dredging
Maintenance dredging 1,237,000 cubic yards
Inlet Channel
1972-76
Dredging
Maintenance dredging 5,005,000 cubic yards
Inlet Channel
1985-87
Dredging
Maintenance dredging 1,151,000 cubic yards
Inlet Channel
Maintenance dredging 4,398,000 cubic yards placed at Gilgo Inlet Channel
1988-93
Dredging
Beach
Dredging & Placement fronting traffic circle at Robert Moses
1993
Flood Shoal
Beach fill
1994-Mar Dredging
Dredging 5,180,363 cubic yards: 4,317,250 placed at Gilgo
Inlet Channel
2002
Beach and 863,113 at Robert Moses SP
18