1.5
Goldsmith Inlet and Pond Calculated Water Level
------ Measurements
Offshore, Node 20, Node 30
------ DYNLET Calculations Node 20
------ DYNLET Calculations Node 30
1.0
0.5
0.0
-0.5
-1.0
-1.5
10/7
10/8
10/9
10/6
10/5
5 - 8 October 2002
Figure 5-24f. Water-level measurements offshore of Goldsmith Inlet and
DYNLET Nodes 20 and 30 calculations, 5-8 October 2002
Figures 5-25a to 5-25c plot the total discharge for the nodes referenced in